This is detailed work distribution. The member of the team are advised to ask any member in the team if there are any cloudiness and confusion. The task is distributed in this manner to let each member of the team to have hand-on in this project. However, the project is executed as a team and each member will have experience in doing every aspect of the task. This task work for both project which is alarm system and line follower robot.

TASK 1
  • Task - Circuit Design and Analysis
    • Motor Controller
    • PIC
    • Sensor
  • Person in charge - Hassan and Izzat


TASK 2
  • Task - Mechanical Design and Analysis 
    • Body/Device Design
    • Assembly
  • Person in charge - Rosli and Madnok


TASK 3
  • Task - Controller
    • Programming
    • Testing/Troubleshooting
  • Person in charge - All 


TASK 4
  • Task - Buy and getting the component
    • Electronics component
    • Mechanical component
  • Person in charge - Rosli and Hassan


TASK 5
  • Task - Technical Report
  • Person in charge - All


TASK 6
  • Task - Manage Blog
  • Person in charge - Madnok